المدهن للمقاولات

المشاريع المنجزة

# Project Name Project Scope
1 MSCECO SUB-STATION = CONSTRUCTION OF 33 / 13.8 KV SWITCHGEAR – S/S # 7822 @ ARTAWIYAH QASSIM AREA Design, Supply & installation of Complete HVAC System @ 30 tons capacity Duty & Standby with DDC Control panel. ( Turn Key Project )
2 BADMINTON SQUARE PROJECT PRINCE FAISAL OLYMPIC STADIUM Riyadh, K.S.A. Design, Supply & installation of complete HVAC system & Fire Fighting system & complete 10 courts of badminton rubber flooring with painting. ( Turn Key Project )
3 SCECO SUB-STATION = CONSTRUCTION OF 33 / 13.8 KV SWITCHGEAR – S/S # 7623 @ AFIF DAWADMI Design, Supply & installation of Complete HVAC System @ 30 tons capacity Duty & Standby with DDC Control panel. ( Turn Key Project )
4 SCECO SUB-STATION = CONSTRUCTION OF 33 /13.8 KV SWITCHGEAR – S/S # 7855 @ MIDNAB QASSIM AREA Design, Supply & installation of Complete HVAC System @ 30 tons capacity Duty & Standby with DDC Control panel. (Turn Key Project)
5 SCECO SUB-STATION = CONSTRUCTION OF 13.8 KV SWITCHGEAR – S/S # 7703 @ AL KHARJ AREA Design, Supply & installation of Complete HVAC System @ 15 tons capacity Duty & Standby with DDC Control panel. (Turn Key Project)
6 SCECO SUB-STATION = CONSTRUCTION OF 33 KV SWITCHGEAR – S/S # 7725 @ AL KHARJ AREA) Design, Supply & installation of Complete HVAC System @ 25 tons capacity Duty & Standby with DDC Control panel. (Turn Key Project)
7 KING SAUD UNIVERSITY MALL PROJECT Riyadh, K.S.A Supply & installation of Complete Ductworks , Air distribution & Ventilation
8 SCECO SUB-STATION = CONSTRUCTION OF 33 KV SWITCHGEAR – S/S # 7021 Ext. @ MOI TV PROJECTS Design, Supply & installation of Complete HVAC System @ 15 tons capacity Duty & Standby with CONV. Control panel. (Turn Key Project)
9 SCECO SUB STATION S/S # 7163 Riyadh, K. S. A. SHORT FORM CONTRACT WITH SCECO – COMPLETE GENERAL SNAGS FOR S/S #7163 @ DIRAB
10 SCECO SUB STATION S/S # 7167 Riyadh, K. S. A. SHORT FORM CONTRACT WITH SCECO – COMPLETE GENERAL SNAGS FOR S/S #7167 @ DURMA